Saturday, April 17, 2010

The Last of the STained Glass





Today our wonderful friend, artist Geri Willingham installed the last 3 stained glass windows (and the biggest) that she created for our home. They all went in our upstairs lounge and we couldn't be more thrilled. They are beautiful inspired by the Florida landscape (both natural and groomed). One window is magnolia blossoms, one is a seagrape, and the other (a stained glass interior panel) is called "Evening Waters". we are so happy.






Wednesday, February 24, 2010

New Gates



While we are in Montreal resting up, work continues at a good clip at the house to get all the final details done. And the gates are starting to arrive. We had gates (designed by our architect, John Stearman) fabricated by the same company that made our railings out of aluminum (lighter and cheaper than wrought iron and a lot easier to take care of over time). I haven't seen them in person, but John sent me these pictures...I am so excited.


Monday, February 22, 2010

Almost IN


We've been so swamped with house, with moving, with being without consistent internet that this blog has suffered. I have all sorts of pictures and news as we are almost completed with the house. Our belongings are in and when we return from Montreal we and animals will be in the house to. So in no particular order here (and in subsequent posts) are pics and info:



When we went to Bali we bought a container load of outdoor furniture, statuary, a hand carved bed, and a myriad of other treasures. It finally arrived (via Miami) the beginning of February and then it was up to us to get everything off the big container. 6 guys, two hours and one fork lift later we had everything on the sidewalk and driveway. 5 hours later we had things in the garden,house, garage, and nooks and crannies. Whew. (I know our neighbors are confirmed we're nuts)



After almost 2 years of limited use due to drought restrictions and 1 year of non-use due to construction the well we use for irrigating the landscape went dry. Sigh. So we had to have a new well drilled. A sentence I never thought I'd write. But dig a well we did...or rather these two suntanned burly types. 120 feet done to clear water. So we have water to keep all that new landscaping going.



Stairs: New and Old. In the top picture, Eric is redoing the old 1925 stairs replacing the old worn treads and adding "pickets" and rail where we opened up the wall into the living room. In the bottom pic is the new mahogany stair that was built offsite and moved into place. This connects from dining room to upstairs lounge. Photos of the completed stair will follow. this is a photo from December.


Saturday, November 7, 2009

We're in the HomeStretch

Since my last post, we've entered into a sales contract on our house in villanova and we close on the 15th of December. Everything seems to be going well in that area. We're happy that a family of 6 will be enjoying our house...it's a house perfectly made for them.

So that puts the pressure on our hardworking architect/supervisor and contractor to get the house done enough for us to move into it by mid December. I'm not sure they are sleeping much these days.

And much progress has been made. Almost all the new wood flooring has been laid. Sanding and finishing should begin towards the end of next week on the new floor. sanding and finishing of the old floor should be done (i think) in two weeks. Trim is going up faster than I can imagine (crown moldings, window trim etc). Looks great. And the old parts of the house pose interesting issues for the trim guys as they try to manuever around walls and ceiling that aren't quite level.

The roof is pretty much done on both the house and the cabana...just a few little tweaks. And it looks FANTASTIC!!! just like i wanted.

Stucco on the outside may be done this week. we've had the worst time getting consistency on the stucco finish (which is a retro pattern from the 30s). its been the most frustrating thing in the past few months. I think Emil (our contractor) is at wits end. But supposedly they've got the idea now and will fix it. we will see.
Ceilings are painted. The Cabinet guys are working on the kitchen redo. The interior doors have arrived.

Elevator guys are working on the elevator innards and we expect it to be done by mid November.

We worked with John to layout our costa rican tiles (that we bought 2 years ago) which will go on the outside of the cabana at the shower and a few other spots on the exterior of the house.

The new stair case is supposedly coming in a week or so...flooring in dining room needs to be done first.

The precast moldings that go around the outside arches and garage door are turning out fantabulous....so happy...so much more reasonably priced than the travertine we originally planned. And speaking of travertine...its still on the boat from Turkey. We figure they must have gone around the world first...very frustrating. We have large terraces and our bathroom waiting for that travertine. So looks like we'll have to go with some other material. grrrrr.

besides the travertine hiccup...we also had a bit of a glitch with the HVAC system leaking (a broken condensate line) and flooding the yet to be floored bathroom and seeping under the newly laid family room and dining room floor. fortunately it didn't get the wood wet...but we've had to remove all the underlayment...try out the concrete subfloor and relay everything...two areas about 100 s.f. total...ugh.

Here a couple of pics...will have more in a few days when I upload my photos.







Sunday, October 18, 2009

Progress

Much has happened since we left for (and returned from) Bali. We have an almost completed roof. Drywall is up and is ready for its final coat prior to painting. Stucco is almost ready for painting. Once the Stucco is done, a/c units will go in and the new floors will be laid. Here are a few recent photos:





Monday, August 31, 2009

End of August LookSee

As Jerry and I wing our way to Bali, work continues at a good clip in St. Pete on our home that we really hope is down in November. Report from our architect/project manager today:

The plumbing materials finally arrived, Steve from quality marble found some matching travertine that looks great, the underlayment roof work is complete, interior doors are on the way, the terrace waterproofing is underway, stucco work continues, the misting rough in is complete, the electrical rough in work is nearly complete and the plumbing rough in work starts again today. Rain is predicted all week but a little water won’t stop most work.

And a few photos from our last visit: