Thursday, July 30, 2009

Two Steps Forward, One Step Back

Today we ordered the new back fence (the old one fell down), decided on all the new doors (there are something like 25 doors), approved the plans for the kitchen cabinets, family room and lounge bookshelves/entertainment center, bathroom cabinets, etc. We also got great bids on the doors, and insulation that are cheaper than first bids. Good news! Now the not so good news....more rot. More repairs to the old house:
That thing that looks like a doorway used to be a wall and window (the window that is resting against the interior wall of what will be my office). They had to take it down today to get to the rot that needs fixing. Sigh.

Tuesday, July 28, 2009

Progress, Progress

Its been a busy 10 days with decisions,decisions, decisions. But progress is being made. Windows are in. Stucco prep starts MOnday. Electrician is ALMOST done then insulation, drywall can start. Work continues on roofing prep and we FINALLY chose the exact mix of tiles for the roof. Bids are in for cabinetry...will decide by Friday. Made first cut at paint colors for interior, will have samples in August and make the "almost final" decisions. Met with landscape architect and approved the design plan and budget. Adding a large number of palms and trees (having to take out two, a dying birch and a dying tangelo). Cool plants designed to attract birds and butterflies. creative trellis to support golden/peach bougainvillea up the walls. Bananas, papayas, and mangos. Awesome
Here are some photos of our progress:

This will be the entrance to the north garden where the pool and main garden is. We had to rebuild the fence which was falling down. Those grills were just installed today. They were made from molds of the original 1928 grills that are in the walls bordering the north side of the garden. The column caps will have a green lt green glass block under them with LED lights in them to glow at night.




These two photos are from window installation day. In the top photo they are putting in the arched window into my bedroom. It will ultimately house a gorgeous stained glass window of a roseate spoonbill along a shoreline. The bottom photo faces the front of the house where there will be a lovely tropical garden in front of the dining room doors. The 2nd floor will be Jerry and my lounge.




Monday, July 6, 2009

Surprises

Almost everytime we have to do anything with the old house we find some unpleasant surprise. We've had to shore up places where there wasn't adequate foundations, replace window framing, search for sources of leaks and repair, etc. This requires opening up walls and ceilings and fishing around. These pics are from the 1928 portion of the house, gives you an idea of how it was built (lath and plaster etc), notice the absense of insulation...we're fixing that with a spray foam insulation (made out of soy amongst other things).







We have WINDOWS!

After weeks of delay, the windows arrived from Oregon in a BIG A#$ truck! They arrived last wednesday and were stored everywhere there was a weather secure space. They are now being installed making the new part of the house water tight which means that drywall and flooring preparation can begin SOON! They are priming the eves of the house. Repairing old rot and decay from an old roof leak in the old part of the house. They managed to repair the ponding on the old 2nd floor balcony without finding anything unexpected, thank heavens. The interior stairway is being constructed off site. The exterior stairwell is being sanded and finished.




We're headed south in 2 weeks when we will have a major push to select the cabinet guys and finalize details about the kitchen redo, bookcases/shelving, and the master bedroom closet layout. We will also need to decide on paint colors for the exterior, stain colors for windows and doors, and narrow down interior colors for the walls.