Much has happened since we left for (and returned from) Bali. We have an almost completed roof. Drywall is up and is ready for its final coat prior to painting. Stucco is almost ready for painting. Once the Stucco is done, a/c units will go in and the new floors will be laid. Here are a few recent photos:
Sunday, October 18, 2009
Monday, August 31, 2009
End of August LookSee
As Jerry and I wing our way to Bali, work continues at a good clip in St. Pete on our home that we really hope is down in November. Report from our architect/project manager today:
The plumbing materials finally arrived, Steve from quality marble found some matching travertine that looks great, the underlayment roof work is complete, interior doors are on the way, the terrace waterproofing is underway, stucco work continues, the misting rough in is complete, the electrical rough in work is nearly complete and the plumbing rough in work starts again today. Rain is predicted all week but a little water won’t stop most work.
And a few photos from our last visit:
Thursday, August 13, 2009
Fans, Alarms, Stucco, More Paint Decisions, Molding
Had a good meeting with John on a muggy kind of thundery day in St. Pete. I was happy because John, organized as always, presented me with my list of things to do and on what days list. I'm a happy camper when you give me an outline of projects.
so today we started discussing ceiling fans of which there will be 12 (and we only have one old one worth using). So we have the catalog and will plan a date with Stan at Dans FanCity and pick them out. Apparently they make the a/c go a lot further with less energy usage and god knows we want to avoid those astronomical energy bills.
speaking of energy bills. we're doing a number of things to use less energy:
Storm rated windows are also more energy efficient and we have them throughout the new section of the house and in the kitchen (part of the old house)
Extra insulation: soy based foam. We are also insulating the older portion of the house which was only half-assed insulated before.
About 85% of the lighting in the house will now be LED lighting which not only uses less energy but is very, very cool (temperature wise) so you use your a/c less
We're installing new high efficiency heatpumps for a/c/ heating.
we're sealing all the cracks around the old windows in the old part of the hosue
And the fans...all 14 of them...to reduce dependency on the AC units
The rest of the day was playing around more with the 2x2boards of paint... deciding on most rooms but still stumped on a few...back for another round of color boards. Met with a guy about estimates for an alarm system and frontdoor speaker system. and we decided on the size and style of molding (floor and ceiling).
Then we ran and got our obligatory blizzard from Dairy Queen because today is Miracle Treat Day when 50% of the proceeds of all blizzard sales goes to the children's miracle network. We had to do our part.
Here are pics from the house today. As Emil and his guys appear to be tearing apart the old house once again. But not so bad today...just finding a place to put in waterproofing so if the window isn't rotted now it won't be in 40 years. You go Emil.
Wednesday, August 12, 2009
Paint, paint, paint

We're back to St Pete for about 12 days. We have lots to do before we head off for Bali for a month.
Yesterday we roamed around the half finished house schlepping around 2ft by 2ft plywood boards with various paint colors we're considering for the house. Made some decisions but put in an order for 8 more boards before we go further. (like i always knew) paint looks a lot different in big spaces than in those little tiny paint chips. And really just how many whites are there?????
The stucco guy is starting prep work for doing the stucco, which means once again i have loads of material and equipment parked on the backyard lawn. at least this time they are avoiding putting stuff directly under the trees on the root zone.
They've started to work on forming the arches over the garage doors, have "found" the well head pump that they accidentally covered up when the poured the cement for the patio. (we use well water for irrigating the yard). Electrical work is almost done...getting a little anxious on that front because they won't start drywall work until its done. plumbing fixtures are supposed to arrive soon (gosh, where are they going to put everything???).
And of course they continue to work on the old part of the house. Emil is doing a great job working with the old windows to make them more moisture/water proof, so if they aren't rotted now they won't rot in the future.
Sunday, August 2, 2009
Photos from the site:
Thursday, July 30, 2009
Two Steps Forward, One Step Back
Today we ordered the new back fence (the old one fell down), decided on all the new doors (there are something like 25 doors), approved the plans for the kitchen cabinets, family room and lounge bookshelves/entertainment center, bathroom cabinets, etc. We also got great bids on the doors, and insulation that are cheaper than first bids. Good news! Now the not so good news....more rot. More repairs to the old house:

That thing that looks like a doorway used to be a wall and window (the window that is resting against the interior wall of what will be my office). They had to take it down today to get to the rot that needs fixing. Sigh.


That thing that looks like a doorway used to be a wall and window (the window that is resting against the interior wall of what will be my office). They had to take it down today to get to the rot that needs fixing. Sigh.
Tuesday, July 28, 2009
Progress, Progress
Its been a busy 10 days with decisions,decisions, decisions. But progress is being made. Windows are in. Stucco prep starts MOnday. Electrician is ALMOST done then insulation, drywall can start. Work continues on roofing prep and we FINALLY chose the exact mix of tiles for the roof. Bids are in for cabinetry...will decide by Friday. Made first cut at paint colors for interior, will have samples in August and make the "almost final" decisions. Met with landscape architect and approved the design plan and budget. Adding a large number of palms and trees (having to take out two, a dying birch and a dying tangelo). Cool plants designed to attract birds and butterflies. creative trellis to support golden/peach bougainvillea up the walls. Bananas, papayas, and mangos. Awesome

These two photos are from window installation day. In the top photo they are putting in the arched window into my bedroom. It will ultimately house a gorgeous stained glass window of a roseate spoonbill along a shoreline. The bottom photo faces the front of the house where there will be a lovely tropical garden in front of the dining room doors. The 2nd floor will be Jerry and my lounge.
Here are some photos of our progress:
This will be the entrance to the north garden where the pool and main garden is. We had to rebuild the fence which was falling down. Those grills were just installed today. They were made from molds of the original 1928 grills that are in the walls bordering the north side of the garden. The column caps will have a green lt green glass block under them with LED lights in them to glow at night.

These two photos are from window installation day. In the top photo they are putting in the arched window into my bedroom. It will ultimately house a gorgeous stained glass window of a roseate spoonbill along a shoreline. The bottom photo faces the front of the house where there will be a lovely tropical garden in front of the dining room doors. The 2nd floor will be Jerry and my lounge.