Since my last post, we've entered into a sales contract on our house in villanova and we close on the 15th of December. Everything seems to be going well in that area. We're happy that a family of 6 will be enjoying our house...it's a house perfectly made for them.
So that puts the pressure on our hardworking architect/supervisor and contractor to get the house done enough for us to move into it by mid December. I'm not sure they are sleeping much these days.
And much progress has been made. Almost all the new wood flooring has been laid. Sanding and finishing should begin towards the end of next week on the new floor. sanding and finishing of the old floor should be done (i think) in two weeks. Trim is going up faster than I can imagine (crown moldings, window trim etc). Looks great. And the old parts of the house pose interesting issues for the trim guys as they try to manuever around walls and ceiling that aren't quite level.
The roof is pretty much done on both the house and the cabana...just a few little tweaks. And it looks FANTASTIC!!! just like i wanted.
Stucco on the outside may be done this week. we've had the worst time getting consistency on the stucco finish (which is a retro pattern from the 30s). its been the most frustrating thing in the past few months. I think Emil (our contractor) is at wits end. But supposedly they've got the idea now and will fix it. we will see.
Ceilings are painted. The Cabinet guys are working on the kitchen redo. The interior doors have arrived.
Elevator guys are working on the elevator innards and we expect it to be done by mid November.
We worked with John to layout our costa rican tiles (that we bought 2 years ago) which will go on the outside of the cabana at the shower and a few other spots on the exterior of the house.
The new stair case is supposedly coming in a week or so...flooring in dining room needs to be done first.
The precast moldings that go around the outside arches and garage door are turning out fantabulous....so happy...so much more reasonably priced than the travertine we originally planned. And speaking of travertine...its still on the boat from Turkey. We figure they must have gone around the world first...very frustrating. We have large terraces and our bathroom waiting for that travertine. So looks like we'll have to go with some other material. grrrrr.
besides the travertine hiccup...we also had a bit of a glitch with the HVAC system leaking (a broken condensate line) and flooding the yet to be floored bathroom and seeping under the newly laid family room and dining room floor. fortunately it didn't get the wood wet...but we've had to remove all the underlayment...try out the concrete subfloor and relay everything...two areas about 100 s.f. total...ugh.
Here a couple of pics...will have more in a few days when I upload my photos.



















That thing that looks like a doorway used to be a wall and window (the window that is resting against the interior wall of what will be my office). They had to take it down today to get to the rot that needs fixing. Sigh.