First Floor block is up! Work appears to be moving quickly. They've double checked and confirmed the measurements on window openings and head heights. Window details have been revised so that they will recess the frames about two inches. A small detail that looks really nice. The electrician continues to rough in wall boxes and light fixture locations. We've added a few more exterior lights to the plan.
Subscribe to:
Post Comments (Atom)


No comments:
Post a Comment