Saturday, March 7, 2009

Perfect Weather for Framing!

John reports that the weather is expected to be 82 degrees next week with no rain. Pefect for framing the second floor which began this past week. We are waiting for the Dining Room decking materials. The second floor has been covered in plywood and the perimeter walls are roughed in place. The small concrete stairs are being formed for a Monday morning concrete pour. John has discovered some interesting views from our bedrooms and is adjusting the rough-in window heights as some are too low.
.

View From Inside Future Family Room


Views looking out the front of the house


Views looking from bedroom out onto what will be a patio deck (partially covered and screened)


Dining Room Roof Beams

View out the corner balcony of the bedroom.

No comments: